(01)How do you keep downtime during cutover to a minimum?
We use Blue-Green or Canary deployments where the new system runs parallel to the legacy system. Traffic is gradually shifted (e.g., 5% → 25% → 50% → 100%) while monitoring metrics in real-time. If a metric crosses the threshold we agreed on beforehand, we automatically switch back to the legacy system.
(02)What happens to my data during migration?
We use CDC (Change Data Capture) with tools like Debezium to synchronize data changes in real-time. Dual-write mechanisms and checksum validations ensure data consistency. Before cutover, we perform restore tests and document rollback procedures.
(03)How do you meet compliance requirements (GDPR, SOC2)?
Security is integrated into every phase: IAM/RBAC for access control, HashiCorp Vault for secrets management, complete audit logs, and zero-trust networking. PII data is handled according to data residency requirements. We document all compliance-relevant measures for audits.
(04)How do you measure migration success?
Before migration, we jointly define SLOs for availability, P95 latency and error rate, derived from measurements of the legacy system. We implement monitoring dashboards with error budgets, automated alerting, and incident runbooks. Post-migration reviews compare actual performance against defined targets.
(05)What's your rollback plan if something goes wrong?
Every migration has a documented rollback plan with clear triggers (e.g., error rate > 1%, latency > SLO). With Blue-Green, we switch traffic back at the load balancer – this takes effect in seconds, without waiting for DNS caches. We conduct rollback drills before go-live and train your team on the runbooks.
(06)What infrastructure options do you offer?
Depending on requirements: Kubernetes (EKS/GKE) for complex workloads with autoscaling and service mesh, or Serverless (Vercel/AWS Lambda) for event-driven architectures. Both options with HA/DR concept, defined RTO/RPO, and regular disaster recovery tests.